Skip to main content

$1,597-$4,218/mo

(8)

Foundry Lake Street

3118 W Lake Street, Minneapolis, MN, 55416

Studio-3 beds 1-2 baths 550-1,460 sqft

All about this rental

Quick overview

Type:
Apartment
Floors:
6
Neighborhood:
Cedar - Isles - Dean
ZIP code:
55416
Built:
2017
Status:
Active
Apartments in the community:
164
Buildings in the community:
1
Last checked:
1 hour ago

Find your perfect layout

Rent specials

Ask about our rent specials!
Individual floor plans may have different offerings. Check the details or reach out to the property for more information.

Perks of living here

Convenience

Enjoy On-site Maintenance, Fiber Speed Internet Connections, a Full-size Washer/Dryer, Climate Controlled Parking Garage, and Concierge Services for a hassle-free lifestyle. \n

Pets

Bike Storage and a Bike Repair Station make it easier for you and your furry friend to explore nearby trails. \n

Lifestyle

Relax and socialize at the Complimentary Coffee Bar, Entertaining Spaces, Gourmet Grilling Station, and Onsite Restaurant/Bar. \n

Fitness

Stay active with the Yoga/Spin Room, Cardio Machines, Strength Machines, Speed Bag, Stretching Area, Free Weights, and Wellbeats virtual fitness programs. \n

Outdoors

Take advantage of Outdoor Fire Pits, a Heated Pool, and City Views for outdoor leisure. \n

Design

Stylish upgrades include Stainless Steel Whirlpool Appliances, Solid Quartz Countertops, Plank Flooring, Oversized Windows, Roller Shades, and Tile Showers* for select units. \n

Standout

Unique features like a Wet Bar, Flat Screen TVs, Furnished Guest Suite, Amenify Professional Lifestyle Services, and Work-from-home-spaces stand out as thoughtful additions.

Shared spaces & benefits

  • Conference Room
  • Work-from-home-spaces
  • Complimentary Coffee Bar
  • Concierge Services
  • Amenify - Professional Lifestyle Services for Residents
  • On-site Management
  • On-site Maintenance
  • Outdoor Fire Pits
  • Pool (heated)
  • Gourmet Grilling Station
  • Entertaining Spaces
  • Wet Bar
  • Flat Screen TVs
  • Cardio Machines
  • Free Weights
  • Strength Machines
  • Stretching Area
  • Speed Bag
  • Yoga/Spin Room
  • Wellbeats
  • City Views
  • Onsite Restaurant/Bar
  • Climate Controlled Parking Garage
  • Common Area WiFi
  • Fiber Speed Internet Connections
  • Furnished Guest Suite
  • Resident Storage
  • Bike Storage
  • Bike Repair Station
  • 100% Smoke Free

In-house comforts

  • Full-size Washer/Dryer
  • Solid Quartz Countertops
  • Kitchen Island
  • 42” Upper Cabinets
  • Kitchen Pantry*
  • Stainless Steel Whirlpool Appliances
  • Refrigerator Water/Ice Dispenser*
  • Gas Range
  • Oversized Windows
  • Roller Shades
  • Bedroom Ceiling Mounted Fan/Light
  • Balcony or Walk-Out Terrace*
  • Dual Vanity*
  • Tile Showers*
  • Plank Flooring
  • Spacious Walk-in Closets*
  • Built-in Closet Shelving
* Only available in select apartments

Ready to see it in person?

Fees & policies

General fees

Security deposit:
$500
Application fees:
$50
There may be additional unit-specific fees.

Pet policy

Pets allowed. Pet limit 2 allowed. Fenced Dog Run, Dog Wash Station. Pet Fee 250 (non-refundable) Pet Deposit 300 (refundable upon lease-completion) Pet Rent 50/mo. cat 50/mo. dog 75/mo. 2 pets (75lb weight limit 1 pet) (Max 2 pets; 120lb combined limit). Breed restrictions apply.
The fees are estimates and actual amounts may vary. Pricing and availability are subject to change. For details, .

Contact info

Cushman & Wakefield
Property listed in the Yardi Rental ILS Network (RentCafe.com & Point2Homes.com).

Get to know the area

Know your way around

81
Very walkable
Walk Score®
50
Good transit
Transit Score®
91
Biker's paradise
Bike Score®
The area around 3118 W Lake Street, Minneapolis, MN, 55416 is highly walkable. Many services and amenities are within walking distance, allowing you to handle most errands without a car. The area has several public transportation options, offering convenience for some routes and destinations. 3118 W Lake Street, Minneapolis, MN, 55416 is located in a biker’s paradise, with an extensive and well-maintained cycling infrastructure for seamless biking.
Walkability data provided by Walk Score®

Plan your commute

  • Minneapolis's city center
    12 min
    21 min
    24 min
Commute times provided by Walk Score® Travel Time.

See what’s nearby

Grandma's House Children's Center
Childcare • 1.57 mi
Southwest KinderCare
Childcare • 1.83 mi
Zuhur Childcare Center Inc
Childcare • 2.03 mi
Lucky Stars Child Care Services
Childcare • 2.07 mi
Hooyo Child Care Center
Childcare • 2.17 mi
Central Care for Children
Childcare • 2.25 mi
Child Garden Montessori
Childcare • 2.38 mi
PICA Head Start
Childcare • 2.63 mi
Dunwoody College of Technology
College • 2.21 mi
MCAD MFA Studios and Gallery
College • 2.27 mi
Minneapolis College of Art and Design
College • 2.30 mi
Minneapolis Community & Technical College
College • 2.42 mi
St. Mary's University of Minnesota
College • 2.66 mi
University of St. Thomas
College • 2.72 mi
North Central University
College • 3.14 mi
Takoda Institute of Higher Education
College • 3.72 mi
Lake St W
Bus
0.08 mi
Market Plaza
Bus
0.09 mi
Calhoun Blvd W
Bus
0.11 mi
Dean Pkwy W
Bus
0.16 mi
West Bde Maka Ska Parkway
Bus
0.17 mi
Calhoun Commons
Bus
0.18 mi
Dean Pkwy E
Bus
0.21 mi
West Lake Street
Train
0.25 mi
Peterson Seaplane Base
Airport
6.06 mi
Eastmans Medicine Lake Seaplane Base
Airport
6.09 mi
Minneapolis-Saint Paul International Airport
Airport
6.77 mi
Bryant Lake Seaplane Base
Airport
7.28 mi
Crystal Airport
Airport
7.93 mi
Lake St W
Bus
0.08 mi
Market Plaza
Bus
0.09 mi
Calhoun Blvd W
Bus
0.11 mi
Dean Pkwy W
Bus
0.16 mi
West Bde Maka Ska Parkway
Bus
0.17 mi
Calhoun Commons
Bus
0.18 mi
Dean Pkwy E
Bus
0.21 mi
Thomas Av S
Bus
0.28 mi
West Lake Street
Train
0.25 mi
West 21st Street
Train
0.86 mi
Beltline Boulevard
Train
1.03 mi
Lakewood Cemetary Stop
Train
1.14 mi
Lakewood Cemetary Platform
Train
1.14 mi
Cottage City Stop
Train
1.33 mi
Bryn Mawr
Train
1.43 mi
42nd St Depot
Train
1.53 mi
Taberna Street Tacos
Restaurant
0.01 mi
CRISP & GREEN
Restaurant
0.02 mi
Subway
Food
0.02 mi
Punch Pizza
Restaurant
0.06 mi
1st Wok
Restaurant
0.08 mi
Falafel King
Restaurant
0.08 mi
Chipotle
Food
0.12 mi
Caribou Coffee
Restaurant
0.12 mi
The Tasting Room
Drinks
1.01 mi
Rumba MPLS
Drinks
1.11 mi
Green Room
Drinks
1.12 mi
Steel Toe Brewing
Drinks
1.18 mi
Morrissey's Irish Pub
Drinks
1.38 mi
Volstead's Emporium
Drinks
1.51 mi
LynLake Brewery
Drinks
1.53 mi
Up-Down
Drinks
1.53 mi
Subway
Food
0.02 mi
Chipotle
Food
0.12 mi
Ben & Jerry's
Food
0.18 mi
Jersey Mike's Subs
Food
0.90 mi
McDonald's
Food
1.05 mi
Potbelly
Food
1.08 mi
Chipotle
Food
1.18 mi
Domino's
Food
1.36 mi
Taberna Street Tacos
Restaurant
0.01 mi
CRISP & GREEN
Restaurant
0.02 mi
Punch Pizza
Restaurant
0.06 mi
1st Wok
Restaurant
0.08 mi
Falafel King
Restaurant
0.08 mi
Caribou Coffee
Restaurant
0.12 mi
Noodles & Company
Restaurant
0.13 mi
Wakame Sushi & Asian Bistro
Restaurant
0.18 mi
Best Cleaners
Shopping
0.03 mi
Barnes & Noble
Shopping
0.04 mi
Rustica Bakery & Cafe
Grocery store
0.05 mi
FastFrame
Shopping
0.10 mi
Calhoun Vision
Shopping
0.10 mi
MGM Wine & Spirits
Shopping
0.14 mi
Whole Foods Market
Grocery store
0.15 mi
Baker Sales
Grocery store
0.28 mi
Rustica Bakery & Cafe
Grocery store
0.05 mi
Whole Foods Market
Grocery store
0.15 mi
Baker Sales
Grocery store
0.28 mi
Speedway
Grocery store
0.40 mi
The Kosher Spot
Grocery store
0.67 mi
Lunds & Byerlys
Grocery store
0.97 mi
Black Walnut Bakery
Grocery store
1.08 mi
Cub Foods
Grocery store
1.26 mi
Best Cleaners
Shopping
0.03 mi
Barnes & Noble
Shopping
0.04 mi
FastFrame
Shopping
0.10 mi
Calhoun Vision
Shopping
0.10 mi
MGM Wine & Spirits
Shopping
0.14 mi
Mulberry's
Shopping
0.47 mi
Rodeo Drive Consignment Boutique
Shopping
0.61 mi
Pilgrim Cleaners
Shopping
0.62 mi
GD Nails & Spa
Personal care
0.03 mi
H&R Block
Other
0.03 mi
USPS
Public service
0.06 mi
Fire Station 22
Public service
0.07 mi
European Wax Center
Personal care
0.07 mi
Walgreens
Healthcare
0.09 mi
Calhoun Dental
Healthcare
0.09 mi
Chuck & Don's
Pet care
0.10 mi
Speedway
Automotive
0.41 mi
Wheel Fun Rentals Bde Maka Ska
Automotive
0.64 mi
AM Automation
Automotive
0.79 mi
Midas
Automotive
1.07 mi
Seven Points Parking Ramp
Automotive
1.12 mi
Muffler Clinic & Brakes
Automotive
1.16 mi
8
Automotive
1.17 mi
Jiffy Car Wash & Detail Center
Automotive
1.23 mi
Walgreens
Healthcare
0.09 mi
Calhoun Dental
Healthcare
0.09 mi
Greenway Urgent Care
Healthcare
0.11 mi
Greenway Primary Care Clinic
Healthcare
0.11 mi
All Care Dentistry
Healthcare
0.68 mi
Partners in Pediatrics
Healthcare
0.75 mi
Clinic Femina
Healthcare
0.81 mi
Calhoun Chiropractic Clinic
Healthcare
0.87 mi
Moxy Minneapolis Uptown
Hotel
1.25 mi
AC Hotel by Marriott Minneapolis West End
Hotel
1.87 mi
Homewood Suites
Hotel
1.95 mi
DoubleTree by Hilton Hotel Minneapolis - Park Place
Hotel
2.06 mi
300 Clifton
Hotel
2.15 mi
TownePlace Suites Minneapolis West/St. Louis Park
Hotel
2.26 mi
Minneapolis International Hostel
Hotel
2.27 mi
Townplace Suites by Mariott
Hotel
2.28 mi
H&R Block
Other
0.03 mi
Dero
Other
0.13 mi
Moore Creative Talent, Inc. c
Other
0.26 mi
JT Mega Food Advertising
Other
0.56 mi
Edina Realty
Other
0.60 mi
Service Associates, Inc.
Other
0.81 mi
Sons of Norway
Other
0.96 mi
Lakes Area Reality
Other
1.04 mi
GD Nails & Spa
Personal care
0.03 mi
European Wax Center
Personal care
0.07 mi
Massage Envy
Personal care
0.11 mi
Salon Intrigue
Personal care
0.18 mi
Sunwerks
Personal care
0.19 mi
Sport Clips
Personal care
0.21 mi
Thomas Charles Salon
Personal care
0.55 mi
Honey Nails
Personal care
0.76 mi
Chuck & Don's
Pet care
0.10 mi
City Paws Pet Club - Dog Daycare, Boarding, Training & Grooming
Pet care
0.16 mi
Lake of the Isles Off-Leash Dog Park
Pet care
0.53 mi
City Cat Clinic & Condos
Pet care
1.04 mi
Kenwood Pet Clinic
Pet care
1.04 mi
Uptown Veterinarian
Pet care
1.08 mi
Lulu & Luigi
Pet care
1.12 mi
MetroPet Animal Hospital
Pet care
1.21 mi
Bais Yisroel Synagogue (Haredi)
Place of worship
0.69 mi
Darchei Noam
Place of worship
0.71 mi
Diamond Way Buddhist Temple
Place of worship
0.78 mi
Kenesseth Israel Congregation
Place of worship
0.79 mi
Minnesota Zen Meditation Center
Place of worship
0.93 mi
Saint Mary's Greek Orthodox Church
Place of worship
1.03 mi
Lake of the Isles Lutheran Church
Place of worship
1.14 mi
St. Paul's Episcopal Church
Place of worship
1.31 mi
USPS
Public service
0.06 mi
Fire Station 22
Public service
0.07 mi
VisionBank
Public service
0.70 mi
Wells Fargo
Public service
0.90 mi
Huntington
Public service
0.98 mi
Bridgewater Bank
Public service
1.04 mi
Chase
Public service
1.06 mi
The UPS Store
Public service
1.07 mi
Stretch Lab
Sports
0.02 mi
Modo Yoga
Sports
0.11 mi
Calhoun Beach Athletic Club
Sports
0.24 mi
The Bakken Museum
Entertainment
0.73 mi
YogaFit
Sports
0.95 mi
Six Degrees Uptown
Sports
1.00 mi
Uptown YWCA
Sports
1.02 mi
Walker Library
Entertainment
1.02 mi
The Bakken Museum
Entertainment
0.73 mi
Walker Library
Entertainment
1.02 mi
The Granada Theater
Entertainment
1.03 mi
Uptown Theatre
Entertainment
1.03 mi
Bockley Gallery
Entertainment
1.05 mi
ARTrageous Adventures
Entertainment
1.05 mi
ComedySportz
Entertainment
1.07 mi
Magnetic Originals
Entertainment
1.08 mi
Stretch Lab
Sports
0.02 mi
Modo Yoga
Sports
0.11 mi
Calhoun Beach Athletic Club
Sports
0.24 mi
YogaFit
Sports
0.95 mi
Six Degrees Uptown
Sports
1.00 mi
Uptown YWCA
Sports
1.02 mi
im=x Pilates
Sports
1.07 mi
Heart Yoga
Sports
1.08 mi

Average utility cost in Minnesota

In Minnesota, renters typically spend around $370 per month on utilities, with costs ranging from $35 for internet to $109 for electricity, depending on factors like home size, season, and usage.

Electricity grafic icon
Electricity
$109
Gas grafic icon
Gas
$82
Water grafic icon
Water
$36
Sewer grafic icon
Sewer
$44
Cable grafic icon
Cable
$64
Internet grafic icon
Internet
$35

Community reviews

How are these reviews collected?
3.6 (8 reviews)

Reviews summary

The community reviews for this property highlight a predominantly positive experience for residents. A common theme is the friendly and helpful staff, with multiple reviews praising the maintenance team for their prompt and effective service. The building's location is consistently noted as a strong point, offering convenience and a quiet environment, making it attractive for young professionals and those moving between cities. However, there are some concerns, particularly regarding the amenities around the pool and noise from nearby establishments, especially at night. Security issues have also been mentioned, such as thefts from the garage, which might be a consideration for families and security-conscious renters. Despite these concerns, the positive feedback about staff and location stands out in the majority of recent reviews.
This summary was generated by AI, based on insights from user-submitted reviews. Point2Homes is not responsible for the original content of the reviews. Please read full reviews for more detailed insights.

FAQs about Foundry Lake Street

When was this property’s information last updated?

The details for Foundry Lake Street were last updated 1 hour ago.

What floor plans are available?

Foundry Lake Street offers the following floor plan options: studio, one-bedroom, two-bedroom, three-plus-bedroom.

Is Foundry Lake Street pet-friendly?

Yes, pets are welcome at Foundry Lake Street.
Here are the details:
Pets allowed. Pet limit 2 allowed. Fenced Dog Run, Dog Wash Station. Pet Fee 250 (non-refundable) Pet Deposit 300 (refundable upon lease-completion) Pet Rent 50/mo. cat 50/mo. dog 75/mo. 2 pets (75lb weight limit 1 pet) (Max 2 pets; 120lb combined limit). Breed restrictions apply.

Does Foundry Lake Street have a pool?

Yes, Foundry Lake Street comes with a pool.

What neighborhood is this property in?

3118 W Lake Street, Minneapolis, MN, 55416 is in Cedar - Isles - Dean.

What are popular apartment communities in Cedar - Isles - Dean?

Popular apartment communities in Cedar - Isles - Dean include: The Mezz at West Lake Quarter, The Original at West Lake Quarter, The Gateway at West Lake Quarter, The Abbott, N&E.

How far is Foundry Lake Street from the city center?

Foundry Lake Street is approximately 12 minutes away by car from the city center.

What's the best way to get around the area?

The area around 3118 W Lake Street, Minneapolis, MN, 55416 is highly walkable. Many services and amenities are within walking distance, allowing you to handle most errands without a car. The area has several public transportation options, offering convenience for some routes and destinations. 3118 W Lake Street, Minneapolis, MN, 55416 is located in a biker’s paradise, with an extensive and well-maintained cycling infrastructure for seamless biking.

What childcare centers are close by?

Nearby childcare centers include Grandma's House Children's Center, Southwest KinderCare, Zuhur Childcare Center Inc.

What colleges are close by?

Nearby colleges include Dunwoody College of Technology, MCAD MFA Studios and Gallery, Minneapolis College of Art and Design.

What are the price ranges for the units in this building?

Prices in Foundry Lake Street are at:
  • $1,597-$2,045 for studios
  • $1,748-$3,531 for one-bedroom units
  • $2,930-$3,721 for two-bedroom units
  • $3,074-$4,218 for three-plus-bedroom units

How does this rent compare with rents in Minneapolis?

Rent in Minneapolis averages at $1,718, compared to prices of $1,597-$4,218 /mo at Foundry Lake Street.

Are there any other apartments around for the same amount?

Are there any specials for this property?

Yes, Foundry Lake Street is currently offering the following special(s): Ask about our rent specials!.

Does the rent at Foundry Lake Street include utilities?

No, utilities are not included in the rent at Foundry Lake Street. Tenants are typically responsible for all utilities.

Can I see this property online somehow?

Yes, Foundry Lake Street offers online viewing through a video walkthrough. You'll find it in the photo gallery.

Can I tour Foundry Lake Street?

Yes, you can schedule a tour by using the options available on this page. Business hours are as follows:
Monday: 9:00 AM - 6:00 PM
Tuesday: 9:00 AM - 6:00 PM
Wednesday: 1:00 PM - 6:00 PM
Thursday: 9:00 AM - 6:00 PM
Friday: 9:00 AM - 6:00 PM
Saturday: 10:00 AM - 5:00 PM

Are there any reviews or ratings related to Foundry Lake Street or its management company?

Yes, you’ll find reviews for Foundry Lake Street above—see what past and current residents have to say about living here.

Cast a wider net